Solar Hank

Semper Solaris: license, solar records and local rank

Photo: Raze Solar / Unsplash

Semper Solaris

๐Ÿ“ 1805 John Towers Avenue, El Cajon, CA 92020 ยท (619) 715-4054

Semper Solaris appears on 2,645 home solar systems in utility interconnection records for San Diego, Chula Vista, Oceanside, San Jose, Carlsbad, Fresno, Bakersfield. In San Diego that is 1,559 systems in 2022โ€“2023, number 3 of 97 companies with 30 or more systems there.

Systems in records2,6457 cities
Rank in San Diego#3of 97 companies
Typical system5.3 kWSan Diego
Leased or PPA0%San Diego
Compare quotes from local installersFree ยท your request goes to partner installers, not to Semper Solaris

Counts and license facts from public records, not a review or rating. I have no partnership with Semper Solaris; the name is as the utility recorded it.

Semper Solaris at a glance

License#978152 ยท active ยท California Contractors State License Board
Held bySEMPER HOME (dba SEMPER SOLARIS)
First licensed10/26/2012
License expires10/31/2026
ClassesB General Building, C10 Electrical, C46 Solar, C39 Roofing, C20 Warm-Air Heating, Ventilating And Air-Conditioning
Contractor's bond$25,000
Workers' compthrough 10/10/2026
Complaintsnone on record
Cities in my recordsSan Diego, Chula Vista, Oceanside, San Jose, Carlsbad, Fresno, Bakersfield
Systems in records2,645

License facts: California Contractors State License Board, checked 9/25/2026. Status can change at any time โ€” look the number up again before you sign.

Semper Solaris systems by city

CitySystemsYears coveredRank by systemsShare of city recordsEarliest recordLatest record
San Diego, CA1,5592022โ€“20233 of 976.0%20132023-12
Chula Vista, CA4512022โ€“20233 of 357.1%20132023-12
Oceanside, CA2142022โ€“20234 of 235.6%20132023-12
San Jose, CA1662022โ€“202311 of 441.8%20142023-12
Carlsbad, CA1422022โ€“20236 of 214.3%20132023-12
Fresno, CA802022โ€“202330 of 480.6%20172023-12
Bakersfield, CA332022โ€“202325 of 280.7%20162023-10

Source: LBNL Tracking the Sun, utility interconnection records for ZIP codes around each city. How I count.

Where Semper Solaris stands among local companies

  • San Diego: number 3 of 97; Baker Electric Solar (1,925) is one place above, Sunpower (out of business) (1,552) one place below. Its records in the area run from 2013 to 2023.
  • Chula Vista: number 3 of 35; Bright Ops (562) is one place above, Lennar Homes (370) one place below. Its records in the area run from 2013 to 2023.
  • Oceanside: number 4 of 23; Bright Ops (231) is one place above, Baker Electric Solar (196) one place below. Its records in the area run from 2013 to 2023.
  • San Jose: number 11 of 44; Infinity Energy (173) is one place above, Nrg Clean Energy (162) one place below. Its records in the area run from 2014 to 2023.
  • Carlsbad: number 6 of 21; Sunpower (out of business) (155) is one place above, Kota Construction (89) one place below. Its records in the area run from 2013 to 2023.
  • Fresno: number 30 of 48; Nova West Solar (88) is one place above, Turn Key Construction (80) one place below. Its records in the area run from 2017 to 2023.
  • Bakersfield: number 25 of 28; Green Day Electric (34) is one place above, Bsw Roofing And Solar (32) one place below. Its records in the area run from 2016 to 2023.

System size, batteries and leases

  • San Diego: typical system 5.3 kW against 5.7 kW for the typical company in San Diego; 12% of systems had a battery. 0% of them were leased or under a PPA (all San Diego records: 18%).
  • Chula Vista: typical system 5.5 kW against 5.6 kW for the typical company in Chula Vista; 11% of systems had a battery. 0% of them were leased or under a PPA (all Chula Vista records: 31%).
  • Oceanside: typical system 5.2 kW against 5.3 kW for the typical company in Oceanside; 14% of systems had a battery. 0% of them were leased or under a PPA (all Oceanside records: 26%).
  • San Jose: typical system 5.9 kW against 6.5 kW for the typical company in San Jose; 42% of systems had a battery. 0% of them were leased or under a PPA (all San Jose records: 18%).
  • Carlsbad: typical system 5.8 kW against 6.5 kW for the typical company in Carlsbad; 15% of systems had a battery. 0% of them were leased or under a PPA (all Carlsbad records: 13%).
  • Fresno: typical system 7.3 kW against 7.8 kW for the typical company in Fresno; 16% of systems had a battery. 0% of them were leased or under a PPA (all Fresno records: 29%).
  • Bakersfield: typical system 8.6 kW against 8.4 kW for the typical company in Bakersfield; 24% of systems had a battery. 0% of them were leased or under a PPA (all Bakersfield records: 24%).

Offered a lease or PPA? Read lease vs buy first.

Before you sign

Companies of similar size in San Diego records

Rec Commercial (3,538), Baker Electric Solar (1,925), Sunpower (out of business) (1,552), Tesla Energy (1,382), Bright Ops (1,136), Owner-installed (no company) (836). Full list: solar companies in San Diego.

Get solar quotes